06 January 2014

Basement Renovation: Day 5


More painting today. For the most part the tan walls are done. There are still a few places that I see they had to spackle over and all the doors are left to do. I'm really liking it and am starting to think about how we're going to organize everything. I do not think the back closet will be big enough for all our boxed junk, and I'm not entirely sure where the litter box(es) will end up. There's no particular reason that the bar has to go back where it was, but it's not like there's a "better" place for it. If we put in a TV the FiOS drop should be along the back wall, but it could easily be snaked just past the door for the water meter (as seen on the left of the above picture).

I'd imagine that they won't do the floor until all the painting is completely done, so Thursday would seem to be the first day they can start that. I don't know how long it will take the liquid leveler to dry, so I don't see Friday as the finishing point. Not a problem; Friday was just wishful thinking on my part.

A look at the back closet with the door shut.
Looking out of the back closet.
The back closet with the opening to the crawl space.

They took the bannister off to paint. I didn't think they'd be doing that given that they wrapped it up in plastic on the first day.


No comments:

Post a Comment