Aside from a door stopper and possibly some paint or grout touchups, both bathrooms are done. The shower in the master bath was slightly sloped away from the drain in one corner, so there was some pooling and that was fixed today. The rest of the tub fixtures were installed and Jameson demanded an early tubby time to try out the new bathroom.
Piper is a fan of the new bathroom too. Here are the hooligans hanging out on the potty


No comments:
Post a Comment