The morning snowstorm and the ensuing traffic problems delayed the contractor this morning, so he wasn't quite able to finish his work today. The countertops are scheduled to arrive between 11:30 and 1:30 so he should have enough time to, if not be finished, be far enough along that they won't be in each other's way.
There's not much left to do. All the drawers are assembled, but not installed. The white laminate will go on the toekick and all the handles need to be attached. There's also a crown molding that will go around the top.